US$ 68.00
these engines were given names
Height - 5
the Garratt locomotive was delivered to the Darjeeling Himalayan Railway in 1911 and was put into service on the 30th of June
Manufactured by Hitachi Rail
making it a strong contender in the production-based endurance classic
R40502A Mk4 TF Trailer First LNER 11417 (Coach M) Code-83 these engines were given namesFollowing on from the Mk3 coach, the Mk4s were built between 1989 and 1992 at Metro Cammells Washwood Heath facility for the newly electrified InterCity 225 services on the East Coast Main Line. A total of 282 carriages were built, to maintain a fleet of 30 fixed formations. Each one comprised of nine vehicles, operating with a Class 91 locomotive and a Driving Van Trailer on the other end to allow trains to operate in both directions without needing
US$ 68.00
US$ 53.00
US$ 31.99
US$ 49.99
US$ 30.99
US$ 173.00
US$ 45.99
US$ 17.99
US$ 150.00
US$ 167.00
US$ 48.99
US$ 168.00
US$ 180.00