Goldshell AP280 PSU water cooling radiator During the chip replacement process
Description
During the chip replacement process
Antminer C59 Hydro control board is a control board used to replace and repair malfunctions of Antminer Hydro series miners
1 piece = 50 meters
To use the thermal silicone strip:Tear off the strip according to the length of a row of ASIC chips on the Whatsminer hash board
P/N P21-GB-14-3300-D-V01 Input 200-277VAC 50/6OHz 20A MAX Output 14
Goldshell AP280 PSU water cooling radiator During the chip replacement processGoldshell AP280 power supply Goldshell AP280 power supply for Goldshell CK5, KD5, HS5 miner. The function of the power supply is to stabilize, filter, and transform the input ordinary current and then deliver a pure, stable, and continuous current to other hardware for use. Just like human blood, it feeds other organs. If the CPU is compared to the brain of the miner, then the power supply is equivalent to the heart of the miner. Quality Assurance
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 199.00
US$ 167.50
US$ 712.00
US$ 244.50
US$ 102.50
US$ 135.00





