SteelGrip® Temporary Cable HLL System and Stanchions with 24" beam clamps Rebar Positioning - Controlling and stopping a
Description
- Controlling and stopping a descent
1341001 - Fixed
Static Elongation: 7
high-efficiency Double Pulley designed for use with the JAG TRAXION Double Progress Capture Pulley to make a 4:1 haul system
It is available in two lengths: 2' 6'' or 4' 9'' versions (without connectors)
SteelGrip® Temporary Cable HLL System and Stanchions with 24" beam clamps Rebar Positioning - Controlling and stopping aSteelGrip Temporary Cable HLL System and Stanchions with 24" beam clamps FEATURES Complete 60' Single span Temporary Cable HLL System Includes two I beam stanchions with 4" to 24" clamping range. 3 8" galvanized steel cable with one end terminated and thimbled Features 1 stainless steel coil energy absorber and 2 connecting carabiners In line tension indicator included with 2 galvanized steel shackles System also includes wire rope clips and
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 39.99
US$ 59.99
US$ 80.00





