LHT-7NP-010D Lynton & Barnstaple Brake 3rd No.16 1898-1902 - DCC Fitted Product-Multi-Pack-4 Metal Pantograph
Description
Metal Pantograph
The Combination Lock consists of two parts
Card kit of a terminus station
Stations often had these Water Cranes at the end of the platforms so the locomotives could be refilled without detaching them from the train
LK-10) and Truss (Ref
LHT-7NP-010D Lynton & Barnstaple Brake 3rd No.16 1898-1902 - DCC Fitted Product-Multi-Pack-4 Metal PantographTo compliment the Manning Wardle. Lionheart Trains have produced a range of coaches: Open Third, All Third, Third Brake and Composite Brake. Specification 7mm Scale (1: 43. 5) Designed for OO track 610mm 2ft radius curves Pre Installed carriage lighting DCC controllable option (NEXT 18 Decoder socket fitted) All Third, Open Third, Third Brake & Composite Brake models will be available Injection moulded body with many separately added details All
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























