US$ 19.00
Used for many decades
2 aspect round signal head (R/Y) long wires
The British Railways Standard Mark 2 coach was first introduced in 1963 and the semi-integral construction dispensed with a separate underframe
DECODER 21 Pin Ready
over the years we have only experienced 1 genuine failure on a Lenz decoder and 1 failure on a controller despite having sold many hundreds
LK12113 TT:120 SR (IOWR) Goods Shed Laser Cut Wooden Kit Brand_Metcalfe-Models Used for many decadesBased on those once found at Ventnor West on the Isle of Wight, these new kits will perfectly complement the Hornby Terrier locomotive and coaches due at the same time. Comprising signal box, station building and goods shed, it is also worth mentioning that the station building can be built in one of two ways, either as the full and complete building, or as a shorter station building with canopy plus a separate waiting shelter and canopy, perfect for
US$ 19.00
US$ 2125.00
US$ 45.00
US$ 90.00
US$ 10.00
US$ 20.00
US$ 39.00