US$ 40.00
The ORR performance acceptance tests of 4
Static-Tac® - 1 oz (29
3 different nose variations: Amtrak as-built
This unit is quick and easy to connect up to existing signals on your railway and with the use of screw terminals you do not need to do any soldering
or those about to set off on an exciting journey
2S-015-011D Ivatt 2-6-2T 41241 KWVR Lined Maroon - DCC Fitted Bachmann_Spring_2025 The ORR performance acceptance testsExpected Delivery Q3 Q4 2026 (Subject to Change at Manufacturer's Discretion). The LMS Class 2 2 6 2 tank engines were designed by H. G. Ivatt and constructed between 1946 and 1952 to replace older locomotives. This versatile class was built primarily for branch line duties for which their Prairie wheelbase was well suited. Ivatt also included several labour saving features such as self cleaning ashpans to improve operating economies. Following an
US$ 40.00
US$ 48.00
US$ 49.95
US$ 52.00
US$ 52.00
US$ 60.00
US$ 21.00
US$ 16.00
US$ 30.00
US$ 35.00