US$ 7875.00
finished in BR Bauxite livery with TOPS code ‘VMV’
arrived at Southampton Docks on 23 August 2007 and was moved to Hitachi's new £53 million maintenance facility at Ashford on 30th August where testing commenced on local lines during October
Opened in 1877 the railway was finally closed in 1959
This pack includes a twin terminal for both constant and flickering LED illuminations
We are taking pre orders for when it becomes available
KRM-HUN-OO-F-71 Hunslet Bo-Bo in British Steel Blue No.71 Diesel Locomotive - DCC Fitted ebay-10% finished in BR Bauxite liveryThe Scunthorpe Hunslet Bo Bo In the 1960s British Steel planned the multi million pound refurbishment of the Scunthorpe steelworks site known as the Anchor Project, of which work began in the 1970s. Part of the project was a fleet of new locomotives to take molten iron in torpedo wagons to the BOS (Basic Oxygen Steelmaking plant), These powerful locomotives were to be designed and built by the Hunslet engine company. Work began on the 10 locomotives
US$ 7875.00
US$ 43.40
US$ 66.50